Jamuna Rail Bridge river training works
WREMA subconsultant role
Bangladesh
Construction supervision for river-training works supporting a dedicated 4.8 km railway bridge over the Jamuna River.

Linear infrastructure · Mine water management · Pilbara, Western Australia
Two-dimensional flood modelling to optimise environmental culvert locations for a proposed 12 km conveyor through mulga country.
Two-dimensional flood modelling to optimise environmental culvert locations for a proposed 12 km conveyor through mulga country.
Two-dimensional flood modelling to optimise environmental culvert locations for a proposed 12 km conveyor through mulga country.
Hydrologic and water-resources engineering methods were applied at the level appropriate to the stated assignment.
The work delivered the stated technical assessment and decision-support inputs. No broader project outcome is claimed.