Jamuna Rail Bridge river training works
WREMA subconsultant role
Bangladesh
Construction supervision for river-training works supporting a dedicated 4.8 km railway bridge over the Jamuna River.

Linear infrastructure · Townsville, Australia
Hydraulic modelling of a road-and-rail corridor across tidal floodplain to optimise drainage structures and assess flow impacts.
Hydraulic modelling of a road-and-rail corridor across tidal floodplain to optimise drainage structures and assess flow impacts.
Hydraulic modelling of a road-and-rail corridor across tidal floodplain to optimise drainage structures and assess flow impacts.
Hydrologic and water-resources engineering methods were applied at the level appropriate to the stated assignment.
The work delivered the stated technical assessment and decision-support inputs. No broader project outcome is claimed.